Sunday, May 17, 2020

Nissan Supply Chain Management - 829 Words

ANALYTICAL REPORT: EFFICIENT JIT SUPPLY CHAIN MANAGEMENT INTRODUCTION Nissan Motor Company Ltd is one of the biggest automobile manufacturing companies in the world. It ranked 5th number overall in automobile industry. It was founded by Mr Yoshike Aikawa in 1933 with the name Tobata Casting Ltd but in 1933 the name was changed to Nissan. It’s headquarter is in Japan. In 1962 it entered into European market. Currently, the company has net income more than $300 billion. Since Nissan adopted Just In Time (JIT) based supply system, the inventory levels being reduced from 12 to 2.5 days’ supply. The reduction on the number of days is significantly at 80%.. SUMMARY Nissan introduced a sustained and efficient Just In Time supply chain. JIT†¦show more content†¦The stock retained at the cross-dock is sufficient enough to supply the factory for the next 16 hours before the next arrival of the next supplier collection. iii. ‘Line-haul’ Deliveries The load will leave the cross-dock based on the delivery manifest in order to ensure they meet the required time. The drivers must follow the delivery manifest as they are liable for the correct time delivery and also the location of the delivery. In addition, the drivers must take off-loading and on-loading time as considerations to avoid any late deliveries. At the factory, there is a computerised load receipt system which will act as a proof that the factory already received their package. Furthermore, the computerised load receipt also identifies the re-usable packaging where the line-haul driver will bring along to cross dock. The packaging that being returned to cross-dock will be sent back to the suppliers during the supplier collection process which will be beneficial to reduce wastage and keep the environment clean. CONCLUSION As a conclusion, the operation based on the logistic scheme has helped Nissan to reduce their inventory levels from 12 to 2.5 and finally 0.7 days. The logistic scheme is also proven in reducing the total number of transportation vehicle travel and minimize fuel consumption. In a nutshell, cooperation from all parties are needed to ensure in the efficiency of the supplyShow MoreRelatedSupply Chain Management: Nissan Cogent Case Study2669 Words   |  11 Pages2012 - 2013 Maryam Ali Tahir SUPPLY CHAIN MANAGEMENT EARLY SUPPLIER INVOLVEMENT AND CODEVELOPMENT: NISSAN COGENT CASE STUDY SUPPLY CHAIN MANAGEMENT Table of Contents 1- INTRODUCTION ................................................................................................................................. 3 2- DISCUSSION....................................................................................................................................... 3 3- KEY THEORETICAL POINTSRead MoreCase Study : Japan s Supply Chain Of Nissan Essay1481 Words   |  6 Pagespotential costs and benefits of these actions. Responding to natural disasters was a major task Nissan faced in fiscal 2011 and came to be symbolic for its activities that year. Nissan is always seeking to strengthen its risk management systems in order to better prepare for natural disasters and other emergency situations. While maintaining close communication with its suppliers and each of its global bases, Nissan continue to work hard to minimize risk and keep going smoothl y as it goes (Shiga, 2012)Read MoreSupplier Development Nissan Cogent Case Essay2823 Words   |  12 Pagesï » ¿ TITLE PAGE SUPPLIER DEVELOPMENT: A NISSAN-COGENT CASE-STUDY (M25EKM) PRESENTED BY EMEKA ANTHONY EKPOKOBA 4664871 TABLE OF CONTENT. Introduction Chapter One: Supplier Development. 1.1: Definitions of Supplier development. 1.2: Organizational structures that support the Supplier development scheme. 1.3: Objectives of entering into a partnership with Suppliers 1.4: The role of Leadership in supporting Supplier Development. Chapter Two: Implementing the Supplier DevelopmentRead MoreCase Study : Nissan s Business Objectives, Customer Demand And That The Project Is Worth Proceeding Towards Implementation?1223 Words   |  5 PagesAnthony Rivard MBA 676 Nissan Canada †¢ Problem / Key Issues. o What is the main problem to be solved? ï‚ § How should Dave Richardson evaluate if the proposed ICON project meets Nissan s business objectives, customer demand and that the project is worth proceeding towards implementation? o What are the key issues (sub-problems) that need to be analyzed in order to solve the main problem? ï‚ § What are the potential financial costs and benefits of the ICON project? ï‚ § What affect could the ICON projectRead MoreEssay on Manufacturing Operations and Managing Services2303 Words   |  10 Pagesautomobile industry such as Nissan, Honda and Toyota got highly affected by the disaster. The case mainly focuses on Nissan, the impact of earthquake on the company and how it responded to the calamity. The company took various protective steps to achieve the momentum of business operations back along with making remarkable flow of income and generating fair revenues at the time of calamity to make situations normal. Q1. The case identifies several aspects of the Nissan response that were particularlyRead MoreNissan S Supply Chain2233 Words   |  9 Pages[pic] FACULTY OF ENGINEERING AND COMPUTING Module Assignment SUPPLY CHAIN MANAGEMENT M25EKM By Rama Venkata Naveen Reddy Karri STUDENT ID: 2891540 MODULE LEADER: Mr. Phil Southey YEAR 2009-2010 INDEX Read MoreNissan Cogent Case Study2103 Words   |  9 PagesSUPPLY CHAIN MANAGEMENT NISSAN COGENT CASE STUDY CONTENTS Page number 1. AIM 3 2. INTRODUCTION 3 3.1. Supply Chain 3. NISSAN-An Overview 4 4.2. Mission 4 4.3. SWOT analysis. 4 4. Evolution of COGENT 5 5. COMPARATIVE CASE STUDY 7-8 6.4. Toyota 7 6.5. Nissan 8 6.6. Honda Read MoreCase Study : Nissan Canada Inc.1548 Words   |  7 PagesNissan Canada Inc. Purpose This is a case study analysis on Nissan Canada Inc. (NCI) and its plan to move from a â€Å"make to stock† to a â€Å"make to order† process and the implementation of NCI’s Integrated Customer Ordering Network (ICON). Involved in the implementation of ICON, NCI is faced with several challenges in the conversion of its outdated ordering process to Manugistics, an Enterprise Resource Planning (ERP) system. (Hunter, 2007) Through analyzing the information provided in the case, theRead MoreStrategic Sourcing Of A Supply Chain Management1271 Words   |  6 PagesResponsible Sourcing Before a supply chain manager can truly understand strategic sourcing, they must have a good working knowledge of the purchasing and procurement processes, which I will explain in detail later in my research. Strategic sourcing is an aspect of supply chain management that is becoming more prevalent in the business world. Without strategic sourcing a firm will not and cannot maximize the potential of its supply chain and altogether meet the company’s overall business goalsRead MoreImpact Of Downturn On The Fall Of Construction Output1466 Words   |  6 Pagessince 2008 has generally increased levels of competition and the ‘buying’ of turnover through the submission of low bids. This is especially relevant in capital intensive and high overhead businesses. These price pressures have flowed back up the supply chain, where price reviews have often been worse than the capacity to reduce cost from operations. In fact, there has been inflation exceeding cost incre ases in areas such as energy, which is a key cost line of some construction products manufacturers

Wednesday, May 6, 2020

The Imagination And Sexuality Sexual Relief - 863 Words

The Imagination and Sexuality: Sexual Relief The imagination is the first site of an individual’s existence. It is within the imagination that the individual, through consciousness and unconsciousness, comes to know his or her true self, including one’s desires. Sigmund Freud influenced the studies of psychology and psychoanalysis, defining the unconscious as, â€Å"the storehouse of instinctual desires and needs. Childhood wishes and memories live on in unconscious life, even if they have been erased from consciousness. The unconscious is, in a sense, the great waste-paper basket of the mind – the trash that never gets taken out: ‘in mental life nothing which has once been formed can perish -- †¦ everything is somehow preserved and †¦ in suitable circumstances †¦ it can once more be brought to light’ (Freud 1930: 256). Laura Mulvey beautifully expresses desire in, â€Å"Visual Pleasure and Narrative Cinema†, as, Desire, born with language, allows the possib ility of transcending the instinctual and the imaginary†, which may be understood as the imagination propelling forward with sexual desires (837). In many ways, poets of the Romantic Period, with the use of the imagination, reveal unconscious sexual desires through their writings. Much of this sexual drive triggered by repressed desires exists within Wordsworth’s poem, The Prelude. One may argue that these poets utilized the imagination as an instrument for relief from sexual desires. The imagination, one may say, is exceedinglyShow MoreRelatedImagination Of The Male By John Keats962 Words   |  4 Pagesimagination of the male, where she may perfectly exist displaying that she is property of the male. She does not have her own existence. She only exists within the imagination of the male. For example, in, Lamia, by John Keats, the speaker, with his imagination, builds a temple for the Goddess Psyche to reside. Within the mind of the speaker, she is in perfect form. Sh e is imperfect outside of his mind, lacking voice, lute, pipe and incense sweet, but within his mind she will have all of these. InRead MoreFunny Thing About Sociology : Time Essay862 Words   |  4 Pagesquestions multiple times, and then reviews for structure and sociological imagination; no surprise the rewording starts again. Finally, with great relief the masterpiece is done, the question is asked. One will sit back and admire their question only to realize the real work is about to start. Attempt one at a sociology question: Why do homosexual people â€Å"come out† about their sexuality verses naturally progressing into their sexual identity? â€Å"So, it will be the nature of the question to which youRead MoreFunny Thing About Sociology : Time920 Words   |  4 Pagesover then checked for structure and sociologic imagination. The rewording may starts again with a few tweaks here and there. Finally, with a large sigh of relief the masterpiece is done, the question is asked. One will sit back and admire their question only to realize the real work is about to start. Attempt one at a sociology questions: Why do homosexual people â€Å"come out† about their sexuality verses naturally progressing into their sexual identity? â€Å"So, it will be the nature of the questionRead MoreThe Way Of The Ways1687 Words   |  7 PagesEarth, to contemporary photography. These drawings were produced by Giulio Romano, a student of Raphael, in the early 1520s and subsequently engraved and printed by Marcantonio Raimondi. They form a series of sixteen images depicting a variety of sexual positions practiced between heterosexual couples. None of the original drawings survive today, and the original engravings only survive in small fragments of prints, with an almost complete series remaining from a later copy in woodcut. While RomanoRead MoreFreud And The Czech Republic1159 Words   |  5 Pagespatients problems where of sexual desires. Also Freud was not open minded to over phycologist’s ideas nor towards his patients. However, with Freud’s stubbornness he managed to publish other great works. These works include The interpretation of Dreams, The Psychopathology of Everyday Life, and Three Essays on the Theory of Sexuality. Being that Freud had a poor social intelligence he had a hard time being listen to. Phycologist, even today fel t that his theories were far too sexual, to the point that itRead MoreThe Dangers Of Crutorial Killers1634 Words   |  7 Pagesdidn’t know if I could learn to deal with all forms of abnormal behavior and I was taking a big risk to let strange men, maybe rapists or serial killers, into my home. The good news was, I was extremely curious about learning what this strange, male sexual behavior was all about, and what made these thrill-seekers tick? Why was getting tied up, beaten, and humiliated all the rage in the underground? Why was it only running rampant in the heavily populated city areas? I realized that my curiosity, linkedRead MoreLiterary Criticisms of Shakespeare’s Hamlet Essay1234 Words   |  5 Pagesconnections I never made on my own. For instance, the character Francisco only speaks nineteen lines in the beginning of the play, but Steven Doloff shows just how meaningful they are. Firstly, he â€Å"detects in Franciscos unexplained remark, For this relief much thanks, Tis bitter cold, / And I am sick at heart (I.i.8-9),(1) a foreshadowing of Prince Hamlets melancholy† (Doloff). Shakespeare created this character to indicate Hamlet’s prevalent sadness throughout the play. However, Shakespeare mayRead MoreEssay on Sexuality/Textuality in Tristram Shandy8792 Words   |  36 PagesRice University Sexuality/Textuality in Tristram Shandy Author(s): Dennis W. Allen Reviewed work(s): Source: Studies in English Literature, 1500-1900, Vol. 25, No. 3, Restoration and Eighteenth Century (Summer, 1985), pp. 651-670 Published by: Rice University Stable URL: http://www.jstor.org/stable/450501 . Accessed: 16/12/2012 06:30 Your use of the JSTOR archive indicates your acceptance of the Terms Conditions of Use, available at . http://www.jstor.org/page/info/about/policies/termsRead MoreThe Death Of The Storm By Kate Chopin1839 Words   |  8 PagesPope’s poem Eloisa to Abelard and Calixta from the short story The Storm by Kate Chopin both submit to situations that trigger socially unacceptable actions to take place. These acts of loyalty and disloyalty towards their spouses are merely human sexual desires and passion that have been socially, morally, and religiously repressed. Chopin implies that Calixta’s act of adultery was the reason for her happiness, and in turn her family’s happiness. On the other hand, as shown in Pope’s poem, the disapprovalRead MoreSmugging in the Square: Homosexuality as a Literary Device in James Joyces A Portrait of an Artist as a Young Man.3689 Words   |  15 Pagescreating a hero. Stephan rejects possible companion after companion yet ceaselessly alludes to his constant social isolation. On Stephan’s definition of normal, Garry Leonard has this to say, â€Å"Although Stephan strives for such a system, he also seeks relief from it, declaring all responses illegitimate except for a state he calls ‘esthetic stasis.’†(Leonard, 81) Joyce’s decision to create â€Å"such a system† within Stephan demonstrates Joyce’s choice to make Stephan unable to delineate from what is normal

Tuesday, May 5, 2020

Developing Capacity Portable Water Purifierâ€Myassignmenthelp.Com

Question: Disuses About The Developing Capacity Portable Water Purifier? Answer: Introduction This report reflects the key understanding on the issues and factors faced by promoters while developing capacity portable water purifier. This developed low cost, low capacity portable water purifier will be used to provide portable water to large population around the globe. However, two promoters John and Mike are facing several issues such as financial problems, handling factors and arrangement of employees and technicians. Throughout the time, company has phased life cycle stage problem of this developed portable water purifier product. The main problems in the development of life cycle stage of product of company are related to the newly sophisticated products offered by new entrants in market. However, with a view to reduce the complexity of business, company has decided to enter into sustainable joint venture. This SJV contract will mitigate all the issues and make the portable water purifier products backed by new technologies. Team members of company who will undertake Sustainable joint venture with Vic Solar Company Mike, John, Maria and Graham are the main persons who will enter into SJV What is Sustainable joint venture? It is observed that with the increasing ramified economic changes and threats posed by new entrants in the market, Sustainable solution Pvt ltd has been facing various problems and issues while selling capacity portable water purifier product in market. Furthermore, government has also shifted its inclination towards new entrants in the market. SJV is the joint venture which is made by sustainable solution PVT ltd with the Vic solar with a view to use its newly developed sophisticated technologies. This newly entered contracted named SJV will help capacity portable water purifier to come with effective level of services and mitigating possible high cost attached with the maximum retail price of the product in market (Hubrich, Tetlow, 2015). Issues faced by Sustainable Solution Pvt ltd and failure of SJV agreement in the market There are several problems faced by Sutinble solution Pvt ltd in the market after entering into contract with the Vic Solar Company. The main problem was related to breakthrough in 2011 in form of failure to meet the capacity as per the directions of government. In addition to this, SJV contract should have been resulted to 22% to 25% but to other unforeseen factors, the profit earned by company through SJV contract resulted to 16% which was very less as estimated. However, the project undertaken by companies under SJV contract went wrong right from the beginning and shown inability to supply 12,000 solar panel to the project deadline. This failure damaged the brand image of company and increased the overall finance cost. The amount of benefits received by company from the market is also eliminated and increased the overall cost of the products in the market (Hubrich, Tetlow, 2015). How and when it went wrong After evaluating all the factors, it could be considered that SJV contract with was beneficial one and could have shown high amount of profit if associated factors have taken into consideration in determined approach. The main problem was related to finance and money involved in project. There were several new entrants who were providing imitated solar products at very cheap rate in the market. It is considered that after entering into SJV contract, both companies promised to deliver 12,000 solar panel before deadline (Santamouris, 2016). These levels of failure destruct the functioning of organization and resulted to destruction of business. After that, with a view to comply with the requirement, SJV hurry in imported cheaper product and failed to meet the required capacity as per the standard. In addition to this, SJV negotiate the contract with the Vic solar to provide effective level of technologies to strengthen the solar power as per the required capacity (Hubrich, Tetlow, 201 5). Mitigation of issues faced by John and Mike in their developed capacity portable water purifier product In order to mitigate all the issues and problems faced by Sustainable solution put ltd, company will make proactive plans and implement forecasted planning and policies to make solar power work effective. It is further observed if company could mitigate the alliance problem and put cap on the failure to comply with the use of technologies then it may increase the success chances of new solar power contract. This time company has to evaluate all the variable factors and use of new technologies to overcome the solar power issues (Kandasamy, et al. 2014). Technical strength of Vic solar Vic solar has sophisticated technologies and installed plan which will increase the overall power supply in SJV contract for Sustainable private limited company (Mitragotri, Burke Langer, 2014). With the use of newly introduced Vic solar technologies, company could increase the overall profit of company by 20% in the market while supplying solar power. Vic solar has various joint ventures with other companies and its working experience will result to core competency in supply solar power with high capacity (O'Sullivan, et al, 2014). The formula and set functions Vic solar use in its supply chain management is highly secure and increase the effectiveness of users in using power supply of SJV in market (Saikku, et al. 2017). Other rivals are using low level of substance and factors which might be cheap but less effective as well (Ldeke-Freund, 2014). Source panel, plants and machines used by Vic solar is highly international plants and provide more effective result to clients in market as compared to other rivals. Assurance of Vic Solar It is considered that SJV failed in the market and also did not perform as per the required level of compliance program. The main problem was related to delivery of solar power supply in the market with in the deadline (Zhang, 2016). However, in order to mitigate these associated problems in determined approach, SJV will hire internal control department to mitigate the possible issues. It is observed that if SJV could increase its production process by 20% then it could deliver the promised products with the deadline. However, increased capacity of 20% could also enhance the overall capacity of SJV in the market and will result to delivery of determined solar power supply for clients. With the use of Vic Solar sophisticated and highly developed technologies, SJV will surely increase the efficiency and business functioning to provide more solar power to clients. In addition to this, these imported plants will also make these established products effective in market and increase the ov erall clients satisfaction in the solar market in determined approach. The technical experts of Vic Solar will showcase high level of core competency in generating solar power in the market (Keyhani, 2016). Financial situation of SJV SJV is the strategic alliance made between Sustainable solution pvt ltd and Vic solar company to increase the overall efficiency of the solar project. It is observed that due to unforeseen factors, company has failed to deliver the committed solar power to its clients within the set deadlines. In addition to this, the products and services sold by company in the market are also very costly which result to increase the overall turnover of company. SJV has also faced decreased in its overall profit by 10% which has destruct its financial capacity. Government and other authorities have also declined to deliver the funds and contributions to support the SJV solar functioning. However, with a view to strengthen the financial situation of company, company will have to raise its overall turnover and inject more money in organizations capital (Mathews, et al. 2016). Strategies to come out the financial mess VOI solar and other SJV both are facing financial problems due to its low level of turnover and non-effective solar power supply. In order to mitigate these issues, both VOI solar and SJV need to implement following strategies (Brand, et al. 2016). Injecting more capital in the financial structure of company Increasing the debt funding to reduce the overall cost of capital Hiring of financial management department to manage the finance in business. Maintain the legal department to comply with the legal and ethical issues in business SJV contract has faced the problem due to delay in working and delivering the VOI solar to clients. In addition to this, company has other issues which have decreased its overall profit to 16% and overall turnover. This level of decrease in profit will surely result to destruct the value creation of invested capital of company (Gayer, et al. 2016). Determining the price of new PPA in the market With the negative cash flow and increasing competition from the new entrants in business, company needs to fix price of new PPA to AUD $ .08 to .10/KWH. There will be following outcomes which will be faced by company in market if price of new PPP set to AUD $ .08 to .10/KWH (Memos, et al. 2017). Company could increase its overall profit by increasing the overall turnover. SJV at the price of new PPA to AUD $ .08 to .10/KWH will beat the competitions and rivals offering in solar power. SJV selling its solar power products of new PPA to AUD $ .08 to .10/KWH could increase its brand image and clients satisfaction in determined approach. Setting up of new financial management plan and corporate prepared plan with the collaboration of Vic Solar will increase the overall efficiency of solar power products in market. How to work on existing SJV to come out of financial stress It is observed that proposed SJV of company will increase the overall effectiveness of PPA and comply with the new rules and regulations of Ministry of New and Alternative Energy (MNAE). Changes in existing financial structure and implementing new strategic alliance will increase the overall efficiency of business (Shriver, et al. 2015). Road map for future of newly introduced It is observed that sustainable solution pvt ltd will have to deal with the pricing policies and other new offers made by rivals in the market. It is observed that power solar offer by company in market was accompanied with several issues such as not technically developed, delay in supply and having high cost of the products. It has shown that company needs to manage all these issues and factors in determined approach. However, financial problems and legal problems faced by company are managed by company by implementing separate legal and finance department. However, with a view to strengthen the financial situation of company, company should raise its overall turnover and inject more money in organizations capital. If company should undertake proper level Vic Solar sophisticated and highly developed technologies then efficiency and increased level of solar power to clients will be handled in determined approach. References Brand, L. A., Farnsworth, M. L., Meyers, J., Dickson, B. G., Grouios, C., Scheib, A. F., Scherer, R. D. (2016). Mitigation-driven translocation effects on temperature, condition, growth, and mortality of Mojave desert tortoise (Gopherus agassizii) in the face of solar energy development.Biological Conservation,200, 104-111. Gaier, J. R., Vangen, S., Abel, P., Agui, J., Buffington, J., Calle, C., ... Pirrotta, S. (2016). International Space Exploration Coordination Group Assessment of Technology Gaps for Dust Mitigation for the Global Exploration Roadmap. Hubrich, K., Tetlow, R. J. (2015). Financial stress and economic dynamics: The transmission of crises.Journal of Monetary Economics,70, 100-115. Kandasamy, N., Hardy, B., Page, L., Schaffner, M., Graggaber, J., Powlson, A. S., ... Coates, J. (2014). Cortisol shifts financial risk preferences.Proceedings of the National Academy of Sciences,111(9), 3608-3613. Keyhani, A. (2016).Design of smart power grid renewable energy systems. John Wiley Sons. Ldeke-Freund, F. (2014). BPs solar business model: A case study on BPs solar business case and its drivers.International Journal of Business Environment,6(3), 300-328. Mathews, N., Rao, N., Pattnaik, B., Prasad, G. S. (2016, December). Grid tied Roof top solar: Problems, learnings and solutions. InSustainable Green Buildings and Communities (SGBC), International Conference on(pp. 1-5). IEEE. Mehos, M., Turchi, C., Vidal, J., Wagner, M., Ma, Z., Ho, C., ... Kruizenga, A. (2017).Concentrating Solar Power Gen3 Demonstration Roadmap(No. NREL/TP-5500-67464). NREL (National Renewable Energy Laboratory (NREL), Golden, CO (United States)). Mitragotri, S., Burke, P. A., Langer, R. (2014). Overcoming the challenges in administering biopharmaceuticals: formulation and delivery strategies.Nature reviews. Drug discovery,13(9), 655. O'Sullivan, J., Rogers, A., Flynn, D., Smith, P., Mullane, A., O'Malley, M. (2014). Studying the maximum instantaneous non-synchronous generation in an island systemFrequency stability challenges in Ireland.IEEE Transactions on Power Systems,29(6), 2943-2951. Saikku, L., Tainio, P., Hildn, M., Antikainen, R., Leskinen, P., Koskela, S. (2017). Diffusion of solar electricity in the network of private actors as a strategic experiment to mitigate climate change.Journal of Cleaner Production,142, 2730-2740. Santamouris, M. (2016). Innovating to zero the building sector in Europe: Minimising the energy consumption, eradication of the energy poverty and mitigating the local climate change.Solar Energy,128, 61-94. Schrijver, C. J., Kauristie, K., Aylward, A. D., Denardini, C. M., Gibson, S. E., Glover, A., ... Jakowski, N. (2015). Understanding space weather to shield society: A global road map for 20152025 commissioned by COSPAR and ILWS.Advances in Space Research,55(12), 2745-2807. Zhang, S. (2016). Innovative business models and financing mechanisms for distributed solar PV (DSPV) deployment in China.Energy Policy,95, 458-467.